Skip to main content
Loading…
This section is included in your selections.

A. Vehicular Circulation: The type and arrangement of all roadways shall be in compliance with the Breckenridge engineering regulations.

B. Ingress And Egress: Points of intersection between internal and external circulation systems shall be in compliance with the Breckenridge engineering regulations, and shall be arranged so that both systems function in a safe and efficient manner. (Access onto the state highway is controlled by the state, and any proposal onto the state highway shall be accompanied by correspondence or a permit from the state concerning the proposed access.)

C. Trip Generation: Developments which will generate a volume of vehicular trips which exceed or disproportionately consume the capacity of the external circulation system may have conditions imposed which address the need to provide sufficient traffic carrying capacity to meet this excess demand per the engineering regulations. This may include a requirement to either provide the necessary improvements at time of development or at some later date, including participating in improvement districts, if applicable.

D. Pedestrian Circulation: Development and installation of pedestrian systems which integrate with existing and future town pedestrian systems and with the systems of adjacent developments is required. This will include the provision of sidewalks, where required, and the provision of pedestrian walkways pursuant to the town trails plan, town sidewalk master plan, and the engineering regulations. (Ord. 19, Series 1988; amd. Ord. 17, Series 1996; Ord. 3, Series 2022)