A. The following sections of the International Energy Conservation Code, 2018 Edition, are amended to read as follows:

1. Section C101.1, Title, is amended by adding the name "Town of Breckenridge."

2. Section C101.2, Scope, is amended by adding an additional sentence to read as follows:

For residential buildings this code is to be used in conjunction with any sustainable building ordinance that may subsequently be adopted by the Town of Breckenridge. Where there are conflicting requirements between the two codes, the most restrictive requirement shall be met.

3. Section C102.1.1, Above code programs, is amended by adding new subsections to read as follows:

C102.1.2 Renewable Energy Mitigation Program (REMP).

All exterior energy use as defined in C410 shall be designed and comply with the mandatory requirements of the Breckenridge Renewable Energy Mitigation Program.

4. Section R101.1, Title, is amended by adding the name "Town of Breckenridge."

5. Reserved.

6. Section C101, Scope and General Requirements, is amended by adding a new Section C101.6 to read as follows:

C101.6 Commercial SSBC.

All new structures defined as a Commercial Building in Chapter 2 except structures defined under C101.6.1 of this code shall comply with amended Sections C401.2, C404.11, and C405.10.

7. Section C202, Definitions, is amended by adding the following definitions within the alphabetical order of the existing definitions:

Electric Vehicle (EV). A vehicle registered for on-road use, primarily powered by an electric motor that draws current from a rechargeable storage source that is charged by being plugged into an electrical current source.

Electric Vehicle Supply Equipment (EVSE). The electrical conductors and associated equipment external to the electric vehicle that provide a connection between the premises wiring and the electric vehicle to provide electric vehicle charging.

Electric Vehicle Supply Equipment (EVSE) Installed Space. A parking space with electric vehicle supply equipment capable of supplying a 40-ampere dedicated branch circuit rated at 208/240 volt from a building panel board.

EV Capable Space. A designated parking space which is provided with a listed raceway capable of accommodating a 40-ampere minimum 208/240 volt dedicated branch circuit for each future EV Ready or EVSE Installed parking space. Raceways shall not be less than trade size 1 (nominal 1-inch inside diameter). Raceways shall originate at the main service or subpanel and shall terminate into a listed cabinet, box, or, enclosure in close proximity to the proposed location of the EV Capable parking spaces. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere minimum 208/240 volt dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overprotection device.

EV Ready Space. A designated parking space which is provided with minimum one 40-ampere minimum 208/240 volt dedicated branch circuit for EVSE servicing electric vehicles. The circuit shall terminate in a suitable termination point such as a receptacle, junction box, or an EVSE, and be located in close proximity to the proposed location of the EV Ready parking spaces.

8. Section C401.2, Application, is amended to read as follows:

C401.2 Application.

Commercial buildings shall comply with one of the following:

1. The requirements of ANSI/ASHRAE/IESNA 90.1. The building's annual energy cost shall achieve savings of 25 percent or greater than the baseline building energy model developed using ASHRAE 90.1 Energy Cost Budget protocol.

2. The requirements of Sections C402 through C405 and C408. In addition, commercial buildings shall comply with amended Section C406 and tenant spaces shall comply with Section C406.1.1.

3. The requirements of Sections C402.5, C403.2, C403.3 through C403.3.2, C403.4 through C403.4.2.3, C403.10.1 through C403.10.3, C403.11, C403.12, C404, C405, C407, and C408. The building energy cost shall be equal to or less than 75 percent of the standard reference design building.

9. Section C404, Service Water Heating, is amended by adding a new Section 404.11, Building Water Use Reduction.

C404.11 Building Water Use Reduction.

All commercial buildings shall comply with the requirements as set forth in Section C404.11 and as shown in Table C404.11.1.

Exception: All structures complying with the Department of Energy's Zero Energy Ready Home National Program do not have to comply with Section C404.11.

Table C404.11.1. PLUMBING FIXTURES AND FITTINGS REQUIREMENTS

PLUMBING FIXTURE

MAXIMUM

Water Closets (toilets) - flushometer single-flush valve type

Single-flush volume of 1.28 gal (4.8 L)

Water Closets (toilets) - flushometer dual-flush valve type

Full-flush volume of 1.28 gal (4.8 L)

Water Closets (toilets) - single-flush tank-type

Single-flush volume of 1.28 gal (4.8 L)

Water Closets (toilets) - dual-flush tank-type

Full-flush volume of 1.28 gal (4.8 L)

Urinals

Flush volume 0.5 gal (1.9 L)

Public lavatory faucets

Flow rate - 0.5 gpm (1.9 L/min)

Public metering self-closing faucet

0.25 gal(1.0 L) per metering cycle

Residential bathroom lavatory sink faucets

Flow rate - 1.5 gpm (5.7 L/min)

Residential kitchen faucets

Flow rate - 1.8 gpm (6.8 L/min)a

Residential showerheads

Flow rate - 2.0 gpm (7.6 L/min)

Residential shower compartment (stall) in dwelling units and guest rooms

Flow rate from all shower outlets total of 2.0 gpm (7.6 L/min)211 elk

a. With provision for a temporary override to 2.2 gpm (8.3 L/min) as specified in Section 404.11.1(g)

C404.11.1 Plumbing Fixtures and Fittings.

Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following requirements as shown in Table C404.11.1.

A. Water Closets (toilets) - flushometer valve type. For single-flush, maximum flush volume shall be determined in accordance with ASME A112.19.2/CSA B45.1 and shall not exceed 1.28 gal (4.8 L) per flush. For dual-flush, the full flush volume shall not exceed 1.28 gal (4.8L) per flush. Dual -flush fixtures shall also comply with the provisions of ASME A112.19.14.

B. Water Closets (toilets) - tank-type. Tank-type water closets shall be certified to the performance criteria of the USEPA WaterSense Tank-Type High-Efficiency Toilet Specification and shall have a maximum full-flush volume of 1.28 gal (4.8L) per flush. Dual-flush fixtures shall also comply with the provisions of ASME A112.19.14.

C. Urinals. Maximum flush volume, when determined in accordance with ASME A112.19.2/CBA B45.1, shall not exceed 0.5 gal (1.9L) per flush. Flushing urinals shall comply with the performance criteria of the USEPA WaterSense Specification for Flushing Urinals. Non-water urinals shall comply with ASME A112.19.19 (vitreous china) or IAPMO Z124.9 (plastic) as appropriate.

D. Public Lavatory Faucets. Maximum flow rate shall not exceed 0.5 gpm (1.9L/min) when tested in accordance with ASME A112.18.1/CSA B 125.1.

E. Public Metering Self-Closing Faucet. Maximum water use shall not exceed 0.25 gal (1.0 L) per metering cycle when tested in accordance with ASME A112.18.1/CSA B125.1.

F. Residential Bathroom Lavatory Sink Faucets. Maximum flow rate shall not exceed 1.5 gpm (5.7 L) when tested in accordance with ASME A112.18.1/CSA B125.1. Residential WaterSense High-Efficiency Lavatory Faucet Specifications.

G. Residential Kitchen Faucets. Maximum flow rate shall not exceed 1.8 gpm (6.8 L/min) when tested in accordance with ASME A112.18.1/CSA B125.1. Kitchen faucets shall be permitted to temporarily increase the flow greater than 1.8 gpm (6.8 L/min) but shall not exceed 2.2 gpm (8.3 L/min) and must automatically revert to the established maximum flow rate of 1.8 gpm (6.8 L/min) upon physical release of the activation mechanism or closure of the faucet valve.

H. Residential Showerheads. Maximum flow rate shall not exceed 2.0 gpm (7.6 L/min) when tested in accordance with ASME A112.18.1/CSA B125.1. Residential showerheads shall comply with the performance requirements of the USEPA WaterSense Specifications for Showerheads.

I. Residential Shower Compartment (stall) in Dwelling Units and Guest Rooms. The allowable flow rate from all shower outlets (including rain systems, waterfalls, body sprays, and jets) that can operate simultaneously shall be limited to a total of 2.0 gpm (7.6 L/min).

Exception: Where the area of a shower compartment exceeds 2600 inch² (1.7 m²), an additional flow of 2.0 gpm (7.6 L/min) shall be permitted for each multiple of 2600 inch² (1.7 m²) of floor area or fraction thereof.

J. Water Bottle Filling Stations. Water bottle filling stations shall be an integral part of, or shall be installed adjacent to, not less than 50% of all drinking fountains installed indoors on the premises.

C404.11.2 Appliances.

Commercial appliances shall comply with the following requirements:

A. Clothes Washers and Dishwashers installed within dwelling units shall comply with the ENERGY STAR program requirements for Clothes Washers and ENERGY STAR Program requirements for Dishwashers. Maximum water use shall be as follows:

1. Clothes Washers - Maximum water factor (WF) of 5.4 gal/ft³ of drum capacity (0.7 L/L of drum capacity)

2. Dishwashers - Standard size dishwashers shall have a maximum WF 3.8 gal/full operating cycle (14.3 L/full operating cycle). Compact sizes shall have a maximum WF of 3.5 gal/full operating cycle (13.2 L/full operating cycle). Standard and compact size shall be defined by ENERGY STAR criteria.

B. Clothes washers installed in publicly accessible spaces (multifamily and hotel common areas), and coin/card operated clothes washers of any size used in laundromats, shall have a maximum WF of 4.0 gal/ft³ of drum capacity during normal cycle (.053 L/L of drum capacity during normal cycle).

C. Commercial dishwashers in commercial food service facilities shall meet all ENERGY STAR requirements as listed in the ENERGY STAR Program requirements for Commercial Dishwashers, Version 2.0.

C404.11.3 Commercial Food Service Operations.

Commercial food service operations (restaurants, cafeterias, food preparation kitchens, caterers, etc.) shall comply with the following requirements:

A. Shall use high-efficiency pre rinse spray valves (I.e. valves that function at 1.3 gpm (4.9 L/min) or less and comply with a 26 second performance requirement when tested in accordance with ASTM F2324.

B. Shall use dishwashers that comply with the requirements of the ENERGY STAR Program for Commercial Dishwashers.

C. Shall use boiler-less/connectionless food steamers that consume no more than 2.0 gal/h (7.5 L/h) in the full operational mode.

D. Shall use combination ovens that consume not more than 10 gal/h (38 L/h) in full operational mode.

E. Shall use air-cooled ice machines that comply with the requirements of the ENERGY STAR Program for Commercial Ice Machines.

F. Shall be equipped with hands-free faucet controllers (foot controllers, sensor activated, or other) for all faucet fittings within the food preparation area of the kitchen and the dish room, including pot sinks and washing sinks.

C404.11.4 Medical and Laboratory Facilities.

Medical and laboratory facilities, including clinics, hospitals, medical centers, physician and dental offices, and medical and nonmedical laboratories of all types shall comply with the following:

A. Use only water-efficient steam sterilizers equipped with:

1. Water-tempering devices that allow water to flow only when the discharge of condensate or hot water from the sterilizer exceeds 140°F (60°C).

2. Mechanical vacuum equipment in place of venture-type vacuum systems for vacuum sterilizers.

B. Use film processor water-recycling units where large-frame X-ray films of more than 6 inches (150 mm) in either length or width are processed.

Exception: Small dental X-ray equipment is exempt from this requirement.

C. Use digital imaging and radiography systems where the digital networks are installed.

D. Use a dry-hood scrubber system or, if the applicant determines that a wet-hood scrubber is required, the scrubber shall be equipped with a water recirculation system. For perchlorate hoods and other applications where a hood wash-down system is required, the hood shall be equipped with self-closing valves on those wash down systems.

E. Use only dry vacuum pumps unless fire and safety codes (International Fire Code) for explosive, corrosive, or oxidative gases require a liquid ring pump.

F. Use only efficient water treatment systems that comply with the following criteria:

1. For all filtration processes, pressure gauges shall determine and display when to backwash or change cartridges.

2. For all ion exchange and softening professes, recharge cycles shall be set by volume of water treated or based on conductivity or hardness.

3. For reverse osmosis and nanofiltration equipment with a capacity greater than 27 gal/h (100 L/h), reject water shall not exceed 60% of the feed water and shall be used as scrubber feed water or for the other beneficial uses on the project site.

4. Simple distillation is not an acceptable means of water purification.

G. With regard to food service operations within medical facilities, comply with Section 404.11.3.

10. Section C405, Electrical Power and Lighting Systems, is amended by adding a Section C405.10, EV Charging for New Construction, to read as follows:

C405.10 Electric Vehicle (EV) Charging for New Construction.

The building shall be provided with electric vehicle (EV) charging in accordance with this section and the National Electrical Code (NFPA 70). When parking spaces are added or modified without an increase in building size, only the new parking spaces are subject to this requirement.

C405.10.1 Group A, B, E, I, M, R, and S-2 Occupancies.

Group A, B, E, I, M, R occupancies with 3 or more dwelling units and/or sleeping units, and open or enclosed parking garages under S-2 occupancy shall be provided with electric vehicle charging in accordance with Table C405.10.1. Calculations for the number of spaces shall be rounded up to the nearest whole number. All EVSE Installed and EV Capable Spaces are to be included in the calculation for the minimum number of vehicle spaces as required by the International Building Code.

Table C405.10.1. EV Installed and EV Capable Space Requirements

Total Number of Parking Spaces

Minimum Number of EVSE Installed Spaces

Minimum Number of EV Capable Spaces

1-10

1

-

11-15

2

3

16-19

2

4

20-25

2

5

26+

2

20% of total parking spaces

C405.10.2 Identification.

Construction documents shall designate all electric vehicle capable and electric vehicle supply equipment installed spaces and indicate the locations of conduit and termination points serving them. The circuit breakers or circuit breaker spaces reserved for the electric vehicle capable spaces and electric vehicle supply equipment installed spaces shall be clearly identified in the panel board.

C405.10.3 Accessible Parking.

Where new EVSE Installed Spaces and/or new EV Capable Spaces and new accessible parking are both provided, parking facilities shall be designed so that at least one accessible parking space shall be EV Capable or EVSE Installed.

11. Section C406.1, Requirements, is amended to read as follows:

C406.1 Requirements.

Buildings shall comply with the following:

1. On-site supply of renewable energy in accordance with Section C406.5.

2. Provisions of a dedicated outdoor air system for certain HVAC equipment in accordance with Section C406.6.

3. One additional package selected from the following:

A. More efficient HVAC performance in accordance with Section C406.2.

B. Reduced lighting power in accordance with Section C406.3.

C. Enhanced lighting controls in accordance with Section C406.4.

D. High-efficiency service water heating in accordance with Section C406.7.

E. Enhanced envelop performance in accordance with Section C406.8.

F. Reduced air infiltration in accordance with Section C406.9.

Exception: If the total on-site renewable energy installed per Section C406.5 is at least 10 percent of the energy used within the building for mechanical and service water heating equipment and lighting regulated in Chapter 4, then buildings shall not be required to comply with provisions 2 and 3 of Section C406.1.

12. Section C406.5, On-site renewable energy, is amended to read as follows:

C406.5 On-site renewable energy.

The total minimum ratings of on-site renewable energy systems shall not be less than 3 percent of the energy used within the building for building mechanical and service water heating equipment and lighting regulated in Chapter 4.

13. Section C406.6, Dedicated outdoor air system, is amended by adding Section C406.6.1.

C406.6.1 Energy Recovery System.

Where the supply of air flow rate of a fan system exceeds 30 cfm of outside air, the system shall include an energy recovery system. The energy recovery system shall be configured to provide a change in the enthalpy of the outdoor air supply of not less than 50 percent of the difference between the outdoor air and return air enthalpies, at design conditions. Where an air economizer is required, the energy recovery system shall include a bypass or controls that permit operation of the economizer as required by Section C403.5.

14. 

C409 Title.

Renewable Energy Mitigation Program (REMP)

C409.1 Scope.

This section establishes criteria for compliance with the Breckenridge Renewable Energy Mitigation Program (REMP). The scope of this program includes exterior energy uses and energy production to offset exterior energy use.

C409.2 Mandatory Requirements.

Mandatory Requirements. Compliance with this section requires that the provisions of this section be followed for all exterior energy use. Compliance with this section will be documented via the free Public Domain tool "Breckenridge REMP Calculation Sheet" in the most current version at the time of permit application. Projected energy use, associated energy offset required, fees and credits are defined within this tool.

Credits for on-site renewable energy. The payment-in-lieu option is voluntary. Applicants interested in exterior energy use systems can alternatively choose to produce on-site renewable energy with renewable energy systems such as solar photovoltaics and/or solar hot water, wind, or micro-hydro. The energy efficient technology of ground source heat pumps is also permitted for supplemental on-site energy.

C410 Exterior energy uses.

Commercial exterior energy uses (per list below) may be installed only if the supplemental energy meets the requirements of the Renewable Energy Mitigation Program. This applies to all installation for which an application for a permit is filed or is by law required to be filed with or without an associated Building Permit. This does not apply to work on existing systems that were permitted prior to this code.

1. Snowmelt (i.e. driveways, patios, walkways, etc.)

2. Exterior pools

3. Exterior hot tubs and spas

4. Permanent natural gas or electric systems for heating outdoor commercial spaces.

C410.1 On-site renewable credits.

Credits for renewable energy production will be calculated and applied per "Breckenridge REMP Calculation Sheet" for energy generated on-site. Renewable energy methods listed in the calculator include: solar photovoltaic, solar thermal, ground source heat pumps, hydroelectric and wind power. Provision for alternative method calculations is also provided, but it will require specific review and approval by the Building Official.

C410.2 Snowmelt systems.

1. R-10 insulation shall be installed under all areas to be snowmelted.

2. Required snowmelt controls. All systems are required to have automated controls to limit operation to when moisture is present, outdoor air temperature is below 40F and above 20F, and the slab temperature sensing. Idling of commercial slabs is allowed where public safety is a factor.

3. Snowmelt heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

4. Up to 100 square feet of snowmelt per emergency egress pathway is exempt.

C410.3 Exterior pools.

1. Pool covers are required for all pools, with a minimum R-value of 2.

2. Pool heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

C410.4 Exterior hot tubs and spas.

1. Hot tub and spa covers are required for all hot tubs and spas, with a minimum R-value of 12.

2. Hot tub and spa heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

C410.5 Other permanent natural gas or electric heating and cooking elements.

1. A combined 350,000 BTU budget is allowed for permanent natural gas or electric heating and cooking elements at a reduced renewable offset requirement.

C410.6 Gas fireplace, firepit, firetable controls.

Commercial outdoor natural gas fireplaces, firepits, and firetables shall include timers required to limit the run time of the system. Controls and switching shall be configured so as not to allow continuous operation.

C410.7 Electric heat tape controls.

Electric roof and gutter deicing systems shall include either automatic controls capable of shutting off the system when outdoor temperature is above 40F and below 25F, and which limit the use of the system to daylight hours by means of a programmable timer or automated clock, or moisture detection sensors.

C411

A permit shall not be valid until all fees as in effect at the time of permit submittal are paid in full, or the renewable energy system is proposed for on-site credit. Nor shall a change order to the permit be released until the additional fees, if any, have been paid. REMP compliance will be verified at Certificate of Occupancy or Certificate of Completion according to the proposed plans. C.O. can be withheld if the project is non-compliant.

C412 Pre-existing systems.

Pre-existing systems, for which a prior permit was applied for and granted prior to the effective date of this code, are exempt from this program. Additions or expansions of existing systems that require a permit will require compliance with this above code program.

Pre-existing systems for which a prior REMP payment was paid and which seek to be replaced shall receive a pro-rated credit calculated by the number of years since prior REMP payment divided by 20 years. For example, a REMP payment made for a system permitted 10 years prior to the current replacement being sought will receive credit for ½ of the prior REMP payment and that amount shall be deducted from the REMP payment owed on the replacement. For renewable systems installed on site, full credit will be given for up to 20 years after the date of installation. Credits will only be applied to properly permitted and functioning systems within the scope of the adopted Energy Code and applicable Mechanical and Electrical Codes. Systems installed prior to 20 years before the date of permit application are not eligible for pro-ration of system credits.

Upgrades to existing mechanical equipment (boilers, heat pumps, HVAC equipment, etc.) or renewable energy systems will not require submittal to the REMP program.

C413 Solar photovoltaic systems.

System designer and installer must be certified by Colorado Solar Energy Industries Association (COSEIA) or North American Board of Certified Energy Practitioners (NABCEP), or a licensed Professional Engineer in the State of Colorado.

C413.1 Solar thermal.

The size of solar hot water systems is limited to 500 square feet of collector area absent approval by the Building Official. Systems larger than this limit will be considered, but will require documentation showing year-round utilization of the system.

C413.2 Ground source heat pumps.

In order to use ground source heat pumps for on-site renewable credit, the GSHP system must supply at least 20% of the peak load for heating all the exterior energy uses. Each GSHP shall be tested and balanced and the design engineer shall certify in writing that it meets or exceeds a design coefficient of performance of 3.0 inclusion of source pump power. Design conditions for determining COP will be 30F ground loop temperature measured at the GSHP inlet, and 110F GSHP load side outlet.

15. Section R101.1, Title, is amended by adding the name "Town of Breckenridge."

16. Section R101.5, Compliance, is amended by adding a new Section R101.5.2, Sustainable Building Code, to read as follows:

R101.5.2 Sustainable Building Code.

All new structures defined as Residential Buildings under Chapter 2 of this code shall be designed and comply with the Department of Energy's Zero Ready Home National Program.

Exception: All new residential structures defined per Section R101.5.2 shall register and submit to be reviewed and inspected through the Department of Energy's Zero Energy Ready Home National Program as a training exercise per the town of Breckenridge Building Department. The training program will be effective July 1st, 2020 through December 31st, 2020. Full compliance with the Department of Energy's Zero Energy Ready Home National Program shall be effective January 1st, 2021.

17. Section R102.1.1, Above code programs, is amended by adding new subsections to read as follows:

1. Renewable Energy Mitigation Program (REMP).

All exterior energy use as defined in R408 shall be designed and comply with the mandatory requirements of the Breckenridge Renewable Energy Mitigation Program.

18. Section R202, General Definitions, is amended by adding the following definitions within the alphabetical order of the existing definitions:

Electric Vehicle (EV). A vehicle registered for on-road use, primarily powered by an electric motor that draws current from a rechargeable storage source that is charged by being plugged into an electrical current source.

Electric Vehicle Supply Equipment (EVSE). The electrical conductors and associated equipment external to the electric vehicle that provide a connection between the premises wiring and the electric vehicle to provide electric vehicle charging.

Electric Vehicle Supply Equipment (EVSE) Installed Space. A parking space with electric vehicle supply equipment capable of supplying a 40-ampere dedicated branch circuit rated at 208/240 volt from a building panel board.

EV Capable Space. A designated parking space which is provided with a listed raceway capable of accommodating a 40-ampere minimum 208/240 volt dedicated branch circuit for each future EV Ready or EVSE Installed parking space. Raceways shall not be less than trade size 1 (nominal 1-inch inside diameter). Raceways shall originate at the main service or subpanel and shall terminate into a listed cabinet, box, or, enclosure in close proximity to the proposed location of the EV Capable parking spaces. Raceways are required to be continuous at enclosed, inaccessible or concealed areas and spaces. The service panel and/or subpanel shall provide capacity to install a 40-ampere minimum 208/240 volt dedicated branch circuit and space(s) reserved to permit installation of a branch circuit overprotection device.

EV Ready Space. A designated parking space which is provided with minimum one 40-ampere minimum 208/240 volt dedicated branch circuit for EVSE servicing electric vehicles. The circuit shall terminate in a suitable termination point such as a receptacle, junction box, or an EVSE, and be located in close proximity to the proposed location of the EV Ready parking spaces.

19. Table R402.1.2, Insulation and Fenestration Requirements by Component, is amended by adding footnotes (j) and (k) to read as follows:

Footnote j. For alterations, additions, and remodels of 1,500 square feet or less in size, R23 blown in bibs are permitted to be installed in walls in lieu of the R20+5 for additions and remodels. If utilizing the R23 bibs, the roof/ceiling insulation reductions detailed in R402.2.1 and R402.2.2 are not allowed.

Footnote k. A fenestration U-Factor of 0.32 is permitted for window replacementsfor Climate Zone 7 and 8.

20. Section R404, Electrical Power and Lighting Systems, is amended by adding a new Section R404.2, Electric vehicle (EV) charging for new construction, to read as follow:

R404.2 Electric vehicle (EV) charging for new construction.

New construction shall facilitate future installation and use of Electric Vehicle Supply Equipment (EVSE) in accordance with the National Electrical Code (NFPA 70).

R404.2.1 One and two family dwellings and townhouses.

For each dwelling unit, at least one EV Ready Space shall be provided. The branch circuit shall be identified as "EV Ready" in the service panel or subpanel directory and the termination shall be marked as "EV Ready".

Exceptions:

1. EV Ready Spaces are not required where no parking spaces are provided.

2. This section does not apply to parking spaces used exclusively for delivery vehicle purposes.

R402.2 Multifamily dwellings (3 or more units).

EVSE Installed and EV Capable Spaces shall be provided in accordance with Table R404.2.2. Where the calculation of percent served results in a fractional parking space, it shall be rounded up to the next whole number. The service panel or subpanel circuit directory shall identify the space reserved to support EV charging, as "EVSE Installed" or "EV Capable".

Table R404.2.2. EV Ready Space and EV Capable Space Requirements

Total Number of Parking Spaces

Minimum Number of EV Ready Spaces

Minimum Number of EV Capable Spaces

1-10

1

-

11-15

1

3

16-19

2

4

20-25

2

5

26+

2

20% of total parking spaces

R404.2.3 Identification.

Construction documents shall designate all electric vehicle capable spaces, electric vehicle ready spaces, and electric vehicle supply equipment installed spaces and indicate the locations of conduit and termination points serving them. The circuit breakers or circuit breaker spaces reserved for the electric vehicle capable spaces, electric vehicle ready spaces, and electric vehicle supply equipment installed spaces shall be clearly identified in the panel board. The conduit for the electric vehicle capable spaces shall be clearly identified at both the panel board and the termination point at the parking space.

R404.2.4 Accessible Parking.

Where new EVSE Installed Spaces and/or new EV Ready Spaces and new accessible parking are both provided, parking facilities shall be designed so that at least one accessible parking space shall be EV Ready or EVSE Installed.

21. 

R407 Title.

Renewable Energy Mitigation Program (REMP)

R407.1 Scope.

This section establishes criteria for compliance with the Breckenridge Renewable Energy Mitigation Program (REMP). The scope of this program includes exterior energy uses and energy production to offset exterior energy use.

R407.2 Mandatory Requirements.

Compliance with this section requires that the provisions of this section be followed for all exterior energy use. Compliance with this section will be documented via the free Public Domain tool "Breckenridge REMP Calculation Sheet" in the most current version at the time of permit application. Projected energy use, associated energy offset required, fees and credits are defined within this tool.

Credits for on-site renewable energy. The payment-in-lieu option is voluntary. Applicants interested in exterior energy use systems can alternatively choose to produce on-site renewable energy (Section R412) with renewable energy sources such as solar photovoltaics and/or solar hot water, wind, or micro-hydro. The energy efficient technology of ground source heat pumps is also permitted for supplemental on-site energy.

R408 Exterior energy uses.

Residential exterior energy uses (per list below) may be installed only if the supplemental energy meets the requirements of the Renewable Energy Mitigation Program. This applies to all installation for which an application for a permit is filed or is by law required to be filed with or without an associated Building Permit. This does not apply to work on existing systems that were permitted prior to this code.

1. Snowmelt (i.e. driveways, patios, walkways, etc.)

2. Exterior pools

3. Exterior hot tubs and spas

4. Permanent natural gas or electric systems for heating outdoor residential spaces.

R408.1 On-site renewable credits.

Credits for renewable energy production will be calculated and applied per "Breckenridge REMP Calculation Sheet" for energy generated on-site. Renewable energy methods listed in the calculator include: solar photovoltaic, solar thermal, ground source heat pumps, hydroelectric and wind power. Provision for alternative method calculations is also provided, but it will require specific review and approval by the Building Official.

R408.2 Snowmelt systems.

1. R-10 insulation shall be installed under all areas to be snowmelted.

2. Required snowmelt controls. All systems are required to have automated controls to limit operation to when moisture is present, outdoor air temperature is below 40F and above 20F, and the slab temperature sensing. Idling of residential slabs is not permitted.

3. Snowmelt heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

4. Up to 100 square feet of snowmelt continuous to a residential building is exempt for safety.

R408.3 Exterior pools.

1. Pool covers are required for all pools, with a minimum R-value of 2.

2. Pool heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

R408.4 Exterior hot tubs and spas.

1. Hot tub and spa covers are required for all spas, with a minimum R-value of 12.

2. Packaged spas less than 64 square feet are exempt.

3. A maximum of (1) hot tub or spa per residential property is exempt. For residential HOAs with individual ownership, 64 square feet of hot tub or spa space is exempt for every 10 residential units.

4. Hot tubs and spa heating appliances will have a minimum efficiency of 92% AFUE. Electric resistance and heat pump heaters will be allowed. Where condensing boilers are used, the boiler supply water temperature shall be a maximum of 130F to allow for efficient boiler operation.

R408.5 Other permanent natural gas or electric heating and cooking elements.

1. A combined 200,000 BTU budget is allowed for permanent natural gas or electric heating or cooking elements at a reduced renewable offset requirement.

R409 Gas fireplace, firepit, firetable controls.

Residential outdoor natural gas fireplaces, firepits, and firetables shall include timers required to limit the run time of the system. Controls and switching shall be configured so as not to allow continuous operation.

R409.1 Electric heat tape controls.

Electric roof and gutter deicing systems shall include either automatic controls capable of shutting off the system when outdoor temperature is above 40F and below 25F, and which limit the use of the system to daylight hours by means of a programmable timer or automated clock, or moisture detection sensors.

R410 Renewable energy mitigation payment.

A permit shall not be valid until all fees as in effect at the time of permit submittal are paid in full, or the renewable energy system is proposed for on-site credit. Nor shall a change order to the permit be released until the additional fees, if any, have been paid. REMP compliance will be verified at Certificate of Occupancy or Certificate of Completion according to the proposed plans. C.O. can be withheld if the project is non-compliant.

R411 Pre-existing systems.

Pre-existing systems, for which a prior permit was applied for and granted prior to the effective date of this code are exempt from this program. Additions or expansions of existing systems that require a permit will require compliance with this above code program.

Pre-existing systems for which a prior REMP payment was paid and which seek to be replaced shall receive a pro-rated credit calculated by the number of years since prior REMP payment divided by 20 years. For example, a REMP payment made for a system permitted 10 years prior to the current replacement being sought will receive credit for ½ of the prior REMP payment and that amount shall be deducted from the REMP payment owed on the replacement. For renewable systems installed on site, full credit will be given for up to 20 years after the date of installation. Credits will only be applied to properly permitted and functioning systems within the scope of the adopted Energy Code and applicable Mechanical and Electrical Codes. Systems installed prior to 20 years before the date of permit application are not eligible for pro-ration of system credits.

Upgrades to existing mechanical equipment (boilers, heat pumps, HVAC equipment, etc.) or renewable energy systems will not require submittal to the REMP program.

R412 Solar photovoltaic systems.

System designer and installer must be certified by Colorado Solar Energy Industries Association (COSEIA) or North American Board of Certified Energy Practitioners (NABCEP), or a licensed Professional Engineer in the State of Colorado.

R412.1 Solar thermal.

The size of solar hot water systems is limited to 500 square feet of collector area absent approval by the Building Official. Systems larger than this limit will be considered, but will require documentation showing year-round utilization of the system.

R412.2 Ground source heat pumps.

In order to use ground source heat pumps for on-site renewable credit, the GSHP system must supply at least 20% of the peak load for heating all the exterior energy uses. Each GSHP shall be tested and balanced and the design engineer shall certify in writing that it meets or exceeds a design coefficient of performance of 3.0 inclusion of source pump power. Design conditions for determining COP will be 30F ground loop temperature measured at the GSHP inlet, and 110F GSHP load side outlet.

22. Section R501.1, Scope, is amended by adding Section R501.1.2, Additions and alterations.

R501.1.2 Additions and alterations.

Additions and interior alterations to an existing building where the total valuation is $50,000 or greater, an energy audit shall be provided for the existing structure prior to permit issuance. The energy audit recommendations and/or conclusions shall not affect the scope of work submitted for the permit.

Exceptions: Re-roofs, exterior siding repair or replacement, and deck additions, repairs, or alterations shall not require an energy audit to be conducted.

23. Section R101.5, Compliance, is amended by adding section 8-1-9A(15) of this code (R101.5.2) to read as follows:

All new structures defined as Residential Buildings under Section N1101.6 (R202) of the 2018 International Residential Code shall be designed and comply with either the Department of Energy Zero Energy Ready Home National Program; or, one of the options set forth below:

2021 IECC Prescriptive Option:

 • Forced air-furnace system, minimum 97% AFUE.

 • Radiant heating system, minimum 95% AFUE.

 • Heat pump minimum efficiency, Heating Seasonal Performance Factor (HSPF) 10.

 • High-efficacy LED lights, minimum 100%.

 • Energy efficient water heater.

  ■ Electric, minimum 0.95 energy factor.

  ■ Gas, minimum 0.76 energy factor.

 • Provide an electrical car charging rough in, including a blanked electrical box, and a raceway terminating in the electrical panel per Article 625 of the 2020 NEC.

 • Provide PV ready construction including a metal raceway from the electrical panel to the roof location where the panels will be installed, including a roof jack, a #8 copper ground, a 2 pull blank in the electrical panel and an electrical conduit from the electrical panel out to the electric meter.

 • WaterSense fixtures throughout.

 • HRV/ ERV, 65% sensible heat recovery efficiency, meeting minimum airflow rates per IRC installed.

 • Maximum 30% of exterior walls to be fenestrations.

 • Programmable thermostats.

Thermal envelope requirements:

Roof/ceiling:

R60, or R49 uncompressed over the top plate

Above grade walls:

R30 cavity or

R20 cavity, R5 continuous insulation (ci) or

R13 cavity, R10 ci or

R20 ci

Slabs, including slab edge:

R10

Fenestrations:

Max U 0.32

Floor R-value:

R38

Basement wall:

R15 ci or

R19 cavity or

R13 cavity, R5 ci

Mass Wall:

R19 ci or

R21 cavity

Crawl space wall:

R15 ci or

R19 cavity or

R13 cavity, R5 ci

Blower Door:

ACH 2.7 at a pressure 0.2 inches w.g. (50 Pascals)

These specifications are based on the requirements of the 2021 Edition of the International Energy Conservation Code, thermal envelope requirements as described in Table R402.1.2, which should be referred to for interpretation reasons.

Or;

2. PV Prescriptive Option:

 • Forced air-furnace system, minimum 97% AFUE.

 • Radiant heating system, minimum 95% AFUE.

 • Heat pump efficiency, Heating Seasonal Performance Factor (HSPF) 10.

 • High-efficacy LED lights, minimum 100%.

 • Energy efficient water heater.

  o Electric, minimum 0.95 energy factor.

  o Gas, minimum 0.76 energy factor.

 • Provide an electrical car charging rough in, including a blanked electrical box, and a raceway terminating in the electrical panel per Article 625 of the 2020 NEC.

 • WaterSense fixtures throughout.

 • HRV/ ERV, 65% sensible heat recovery efficiency, meeting minimum airflow rates per IRC installed.

 • Maximum 30% of exterior walls to be fenestrations.

 • Programmable thermostats.

Thermal envelope requirements:

Roof/ceiling:

R49

Above grade walls:

R23 cavity or

R20 cavity, R5 continues insulation (ci)

Slabs, including slab edge:

R10

Fenestrations:

Max U 0.35

Floor R-value:

R38

Basement wall:

R15 ci or

R19 cavity or

R13 cavity, R5 ci

Mass Wall:

R19 ci or

R21 cavity

Crawl space wall:

R15 ci or

R19 cavity or

R13 cavity, R5 ci

Blower Door:

ACH 3.0 at a pressure 0.2 inches w.g. (50 Pascals)

PV system: Provide an onsite PV system sized to provide 25% of the total annual energy use determined through an engineered solar calculator approved by the Town of Breckenridge Building Department. The PV system will be limited by the allowable maximum size as determined by the electrical service provider.* Residential buildings over 4,000 sq. ft. must have an estimated annual energy consumption evaluation stamped by a Colorado state licensed engineer, to be submitted with PV permit application.*

*If either of the prescriptive options are chosen, no substitutions are allowed. If substitutions are needed, utilize the performance based DOE ZERH option.

(Ord. 38, Series 2019; amd. Ord. 12, Series 2020; Ord. 26, Series 2022; Ord. 21, Series 2023)