CHAPTER 2 IN TOWN WATER SERVICE
This chapter is included in your selections.
SECTION:
- 12-2-1: New water systems prohibited
- 12-2-2: Disconnection from private water systems required
- 12-2-3: Extension of water system by developers
- 12-2-4: When new connection required; Exception
- 12-2-5: Size of connection; Owner's responsibility; Town's nonliability
- 12-2-6: Installation of connections
- 12-2-7: Installation and maintenance of certain water facilities by owner
- 12-2-8: Maintenance of certain water facilities by town; General
- 12-2-9: Responsibility for frozen water lines
- 12-2-10: Separate service line required; Exceptions
- 12-2-11: Extension of service line prohibited
- 12-2-12: Director to inspect and approve construction
- 12-2-13: Existing wells
- 12-2-14: Easements required
- 12-2-14-1: Water easement for landscaping, paving, and other uses; Town's nonliability for damage
- 12-2-15: Conveyance of water line
- 12-2-16: Construction of mains, trunk lines and cross connecting loops
- 12-2-17: Water lines and appurtenances; Acceptance; Maintenance
- 12-2-18: Water meters required
- 12-2-19: Water meter installation
- 12-2-20: Water meters; Failure to install
- 12-2-21: Water meter; Restrictions
- 12-2-22: Unlawful to tamper with water meter
- 12-2-23: Water meter maintenance and testing
- 12-2-24: Water meters required for bulk water use; Exception