Skip to main content
Loading…
This section is included in your selections.

A. Public Entity And Special Districts Excavators: Whenever two (2) or more public entity excavators propose major work in the same block within a year, such work shall be performed by one public entity excavator when practical. The participants to the excavation shall pay their pro rata share of the work, or as otherwise agreed to by the affected public entities. For purposes of this subsection A, the public entity excavators shall be treated as a single permit applicant and shall submit one application.

B. Private Entity Excavators: Whenever two (2) or more private entity excavators propose major work in the same block, such work shall be performed by one private entity excavator if possible. For purposes of this subsection B, the private entity excavators will coordinate to determine who will perform the excavation work. Both entities will maintain separate and distinct permits for the purpose of their intended projects. If the town has an interest in installing conduit in the same location the permittee shall install the town's conduit and charge the town the direct cost associated with installing conduit as described in section 11-9-5 of this chapter. Such charges will be paid by the town.

C. Public Entity Excavator And Private Entity Excavator: Whenever a public entity excavator(s) and a private entity excavator(s) propose major work in the same block the department shall condition permits for such work in a manner that maximizes coordination and minimizes the total period of construction. If the town has an interest in installing conduit in the same location the permittee shall charge the town the direct cost associated with install conduit as described in section 11-9-5 of this chapter. (Ord. 9, Series 2018)